The site work will consist of demolition of the existing baseball & practice fields, erosion control, mass excavation, & temporary drainage for the new football field, utilities, & infrastructure required for the new baseball field (approx. 13.72 acres). Construction of a new baseball field will include new artificial turf, new press box with restroom & storage, new bleacher seating, a covered batting cage, site retaining walls & parking.
0100 - General Requirements
0245 - Structure Demolition
0290 - Landscaping / Irrigation
0300 - Concrete Subcontractors
0410 - Cast Stone Masonry
0500 - Structural Steel / Joists / Deck
0710 - Dampproof/Waterproof/Caulk
0750 - Roofing & Sheetmetal
0805 - Hollow Metal / Wood Doors/ Hardware
0880 - Glass/Glazing/Storefront
0910 - Drywall / Acoustical
0990 - Painting & Wallcoverings
1000 - Miscellaneous Specialties
1168 - Athletic Field Equipment
1169 - Outdoor LED Videoboards
1335 - Metal Building Systems
1610 - Electrical Equipment
1690 - Low Voltage Systems
New 20 bed Substance Use Disorder Clinic on existing property. Project is roughly 13,000 SF of new construction. Scope includes masonry/steel structure with interior finishes, MEP systems, and all associated sitework for new construction.
0290 - Landscaping / Irrigation
0300 - Concrete Subcontractors
0500 - Structural Steel / Joists / Deck
0550 - Light Gauge Trusses
0575 - Decorative Metal Panels
0710 - Dampproof/Waterproof/Caulk
0750 - Roofing & Sheetmetal
0805 - Hollow Metal / Wood Doors/ Hardware
0840 - Automatic Entrance Doors
0880 - Glass/Glazing/Storefront
0910 - Drywall / Acoustical
0920 - Plaster / Stucco / EIFS
0990 - Painting & Wallcoverings
1000 - Miscellaneous Specialties
1014 - Folding Panel Partitions